PST will reconstruct wastewater treatment plant in Kedainiai
We have signed a general contract with Kėdainių vandenys UAB. We will reconstruct wastewater treatment plants in Kėdainiai. The cost of performing the works provided for in the contract is about 4.3 million. Eur (including VAT), PST reported. The new infrastructure will allow residents to use a centralized wastewater collection and treatment system. Reconstruction of new wastewater collection and water supply networks will reduce the negative impact on groundwater and open water bodies, ensure reliable protection of open water bodies and aquatic ecosystems, diversity of aquatic ecosystems and biological productivity. Construction works will start in spring of 2020 and complete in autumn in 2021.